After checking through all the parts I started on the Vert Stab, the Emp kit I have is over 20yrs old so nothing is pre drilled, that made things a little interesting, I took my time to make sure that rivets would fall in the right position and with proper edge distance, the assembly process took extra time, marking rivet lines, back drilling and double checking everything. I've now finished the Vertical Stab after around 4-5 days work and almost finished the Rudder.
Vert Stab Skeleton
Skin and frames drilled ready for deburing and dimpling
The old Vert Stab and the new..
Finished Vert Stab..
New Rudder frame drilled
Stiffener angles drilled ready for dimpling
Rudder almost finished, just need to roll the front section
It's taking a while but I'm slowly working threw the rebuild, I'm really enjoying the work and the new challenges I'm finding along the way, Yesterday I had to work out how the install the last rivets on each stiffener angle, at the trailing edge of the rudder it tapers down to around 3/16th or 4 mm, there isn't much room to get a dolly in there so I ground a piece of 1/2in steel rod to put the rivets down, wasn't easy, I'm happy with how the rivets turned out..
Happy building..